York Place (London, UK)
General Info
Promoter
AVANTON
Construction
Midgard
Design Architect
Johson Naylor
Execution Architect
MDS Architects
Type
Residential
Status
Under construction
Area
20.500 m2
Budget
£80m
Services
BIM Execution Plan (BEP)
LOD 300 BIM Modelling of 300 residential units
Clash detection
Technical design
BIM quantity take-offs
As-Built Model and Plans
Achievements
Using Autodesk BIM360 CDE for coodrdination and synchronisation with MEP and Structures
Virtual Construction
Reduction in design programme duration
Fully coordinated design
Real-time change management
Real-time cost control
Improved visual communication with client
Increase in off-site construction
Cost reduction
Asset Information Model